Packing & Delivery

1、Making shipping documents

formal-declare-info
formal-declare-information

In sales' order, once the goods are ready for deliver from godown , the sales need to check the progress with the factory,then preparae customs declaration materials(because they need a formal declare at the customs, they have to make IV and PL correctly). For the customer who exchange for the first time, the sales need to confirm shipping address, company name and part of the name of customs declaration, etc.If the customer has a special request,the sales make customs declaration according to customer's requirement.If customer has not required,they will follow the company's written form.

shipping-document
shipping-documents

After the sales make the declaration materials,they need an initial check, then submit to general affairs office for final inspection.If there's no problem, it will be stamped with the company seal, and become the formal declare information at the customs.

Then the sales instruct the factory to prepare for shipment.

2、The parts should be cleaned before packed

metal parts in the packaging room
packaging-clerk-check

After the final inspection,the metal parts with no problem can be transferred to the packaging room.The packaging clerk will first check the drawing information and part information,such as shape of the part,the quantity,surface treatment etc.If there's no problem,the packaging clerk will put the parts on the drawing and take photos,then archive.

wiped-clean
clean-and-pack

Then we proceed the cleaning of parts.Parts with concavoconvex or concavoconvex places should be rinsed with alcohol or a cleaner such as holes,nematopores,slots.Then we use a cotton swab to remove the cleaning fluid and other liquids.The surface of part should also be wiped clean to look more beautiful.Finally,to avoid surface damage,the product will be wrapped with transparent plastic film.In order to prevent iron and other materials parts rust,the packaging clerk will spray a moderate amount of anti-rust oil on the surface of part.

appropriate packaging
product boxed

At last we need choose the appropriate thickness foaming for packaging,paste the spot product ticket,box,bundle bale.

3、Packing, shipping, and logistics tracking

our products can be shipped by air and sea

Our products can be shipped by air and sea, because our company has signed an agreement with the logistics company, we can enjoy faster, cheaper and more convenient logistics services.

1) Preparation before packing

The operators prepare the appropriate size boxes according to the instructions of the sales personnel.Cartons are used for air transportation and wooden cases are used for sea transportation.

production order
packing box marked on the production order

2) Packaging procedure:

According to the production order,the cash ticket should be consistent with the production order.control number and quantity should be checked and then encased.The parts after loading the box need to be marked on the production order to avoid omissions. At last, the sales personnel confirm and check again.

well-packed

The parts cannot be moved in the box,special shaped parts cannot rub against each other.The space between parts should be filled with newspaper or other bubble wrap, avoiding collision between items and result in part injuries. Then we send the detection report and the dispatch bill to the customer via email. Finally, seal the box with tape, when packaged,concentrate in the specified location,notify related express or logistics personnel to pick up the goods.

logistics personnel to pick up the goods

3) Tracking of transportation of the goods after shipment

After delivered the goods,will send the tracking number to the customer by email,if you have any needs, you could check the detailed transportation and delivery on the express website.